Port of Mobile, Beneficial Re-Use

Upper Mobile Bay, Alabama, United StatesNot specified

The Alabama Port Authority’s Upper Mobile Bay Beneficial Use Wetland Creation Project is a planned, large-scale approach to beneficial re-use of dredged material. The 2021 permit application describes placing about 7.26 million cubic meters of dredged material over 20 years across about 1,200 acres (about 486 ha) of intertidal wetland in northern Mobile Bay (USACE, 2021). The implementation proposal expects about 350,000 cubic yards (about 268,000 m3) a year of Port Authority maintenance material to be available (RESTORE Council, n.d.). The project is planned to divert this material from upland containment areas into engineered wetland creation cells, and is intended to support long-term ecosystem restoration. In June 2026 the State of Alabama announced RESTORE Act funding of USD 24 million to construct the first 100-acre cell of the planned 1,200-acre project (Governor of Alabama, 2026).

The engineering and planning framework developed by Moffatt & Nichol (M&N) includes modeling, permitting and phased design. The implementation proposal describes the first 100-acre (about 40 ha) area divided into two 50-acre areas with internal dikes, surrounded by a sand berm with rock riprap revetment (RESTORE Council, n.d.).

As the cells consolidate to intertidal elevation, they are planned to be sculpted into wetland landscapes, including tidal creeks, high- and low-marsh zones, ponds, embayments and scrub-shrub mounds, intended to provide habitat for estuarine species. Environmental compliance documentation was prepared for the whole project footprint. The implementation proposal reported the USACE permit (SAM-2021-00246-DCH) as pending; this is not evidence of a current permit decision (RESTORE Council, n.d.). M&N also prepared a Long-Term Strategic Sediment Placement Plan to guide adaptive placement. The project is intended to link dredging operations directly to habitat creation and coastal resilience.

Transferability

DMC ports with regular maintenance dredging can plan to place suitable material in contained cells that build up into intertidal wetlands, instead of disposing of it. A long-term placement plan matched to the expected yearly dredging volume lets the work proceed in phases as funding allows. Starting with one cell, enclosed by dikes and a protective berm, tests the method before the full site is committed. Environmental approvals should be sought early for the whole footprint.